In-situ concrete new jersey construction with PowerCurber
As part of the project “Construction Project of the Cycle Path Connecting Villamediana de Iregua – Logroño”, we carried out the singular execution of the in-situ concrete new jersey barrier, with our PowerCurber slipforming equipment.
We have specific machinery for the execution of linear concrete work units for high productions, as is the case of the concrete protection barriers that have been executed in the aforementioned bicycle lane project.
This construction process is highly efficient and achieves finishes that are difficult to match with prefabricated elements, without joints or defects. In addition, it achieves much higher performance levels, a highly important aspect in stressed traffic areas such as the project section.
We have been awarded the “Construction Project of the Cycle Pedestrian Lane Connection of Villamediana de Iregua – Logroño”, which has a P.B.L. of 1.650.240,77 €.
It is one of the 3 cycle-pedestrian lanes that the Government of La Rioja has framed within the framework of the Recovery, Transformation and Resilience Plan (PRTR), financed by the EU through the Next Generation Funds.